Permit Information
Permit NumberFIR16-00071
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 510 W HAYS ST
Project Name510 W HAYS TRI-PLEX
Customer Number 
ePlanReviewYes
Description
[Tri Plex]
The fire sprinkler scope of work consists of installing a complete automatic wet pipe fire sprinkler system throughout the existing triplex per NFPA 13R 2013 on the first and second floor and NFPA 13 2013 in the basement. Work will begin at the connection to the water main at the property line and extend 40' of 2" CPVC to the riser. All CPVC pipe to be covered with soffit (by others) and all exposed pipe to be black steel.

To remodel an existing mixed use building into a three unit (Tri-plex) building. The main floor will be remodeled into two separate dwelling units rather than 1 dwelling unit and a professional office. An existing apartment is located on the 2nd story. Work to include: build dwelling unit separation walls and horizontal separation per plans; install new exterior doors and windows; add insulation per plan locations; provide separate electrical services; construct a new kitchen and bathroom for the new dwelling unit; install smoke detectors; electrical, mechanical, and plumbing work. All work per the approved plans, attached plan review report, and adopted codes. NOTE: This building is NOT fire sprinklered. **SRZ**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection7/15/20197/15/20197/15/2019PPASS
DetailsTroy Cobbley
Ok to final per Jim Page. I witnessed the testing of the fire sprinkler device interconnection with the fire alarm system.

we would like to perform this in conjunction with fire alarm. Phone #: ###-#### Inspection requested via web by Jeff Packham
INSP-Final Inspection6/1/20166/1/20166/1/2016PCANC
DetailsJim Page
Inspection request cancelled per conversation with point of contact, Adam phone number ###-####, fire sprinkler system is not monitored, final inspection cannot be completed until fire sprinkler monitoring is provided by building owner and fire sprinkler alarm signals are verified with monitoring company.
INSP-Sprinkler Rough-in/Hydro3/30/20163/30/20163/30/2016PPASS
DetailsJim Page
Hydrostatic test for underground piping complete, contractor disconnected underground from provided water source and tested the underground that was installed by the sprinkler contractor, hydrostatic test passed once it was disconnected from water source, capped and tested by itself.
INSP-Final Inspection3/30/20163/30/20163/30/2016PCANC
DetailsJim Page
This inspection request cancelled, request is for underground hydrstatic test, new inspection will be generated.
INSP-Sprinkler Rough-in/Hydro3/23/20163/23/20163/23/2016ACANC
DetailsJim Page
Inspection request cancelled per conversation with Adam Phone #: ###-####, underground would not hold pressure, underground hydrostatic test will be rescheduled after repair is made.
INSP-Supply line flush3/22/20163/22/20163/22/2016PDONE
DetailsJim Page
Underground main line flush complete
INSP-Final Inspection3/3/20163/3/20163/3/2016PPASS
DetailsJim Page
Hydrostatic test, 2 hours @ 200 psi passed/complete for overhead sprinkler piping
INSP-Sprinkler Rough-in2/29/20162/29/20162/29/2016PPASS
DetailsJim Page
Rough to cover inspection complete for uderground supply, approved for cover.
INSP-Sprinkler Rough-in/Hydro2/22/20162/22/20162/22/2016PPASS
DetailsJim Page
Overhead fire sprinkler rough to cover inspection complete, all area's approved for cover. Hydrostatic test to be completed at later date.