INSP-Final Inspection | 6/1/2017 | 6/1/2017 | 6/1/2017 | P | PASS |
Troy Cobbley
|
|
|
permit finaled. fan has been relocated
|
INSP-Final Inspection | 5/30/2017 | 5/31/2017 | 5/31/2017 | A | FAIL |
Troy Cobbley
|
|
|
All items tested ok except that the fan in the Truck Bay will need to be shut down upon flow of water. Resubmittals or as-builts will be required at the plan reviewers request.
|
INSP-Final Inspection | 5/25/2017 | 5/26/2017 | 5/26/2017 | A | CANC |
Troy Cobbley
|
|
|
Contact is Sean. Phone #: ###-#### Inspection requested via web by Morgan Ahten
|