INSP-Final Inspection | 6/28/2018 | 6/28/2018 | 6/28/2018 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 6/7/2018 | 6/11/2018 | 6/11/2018 | P | PART |
Troy Cobbley
|
|
|
24hr test started at 9:00an with 40psi on the guage. First and second floor hydro tests passed.
Phone #: ###-#### Inspection requested via web by Matthew Lewis
|
INSP-Sprinkler Rough-in/Hydro | 6/7/2018 | 6/8/2018 | 6/8/2018 | A | PASS |
Troy Cobbley
|
|
|
2nd,3rd floor hydro tests passed.
|
INSP-Supply line flush | 11/8/2017 | 11/8/2017 | 11/8/2017 | P | PASS |
Troy Cobbley
|
|
|
Underground flush passed.
|
INSP-Supply line flush | 8/7/2017 | 8/8/2017 | 8/8/2017 | A | PASS |
Troy Cobbley
|
|
|
The underground flush passed
|
INSP-Sprinkler Rough-in/Hydro | 8/7/2017 | 8/7/2017 | 8/7/2017 | P | PASS |
Troy Cobbley
|
|
|
Underground hydro test passed
|
INSP-Sprinkler Rough-in | 5/4/2017 | 5/8/2017 | 5/8/2017 | A | PASS |
Troy Cobbley
|
|
|
Bury depth has been verifed with laser and is ok to cover.
|
INSP-Sprinkler Rough-in | 5/5/2017 | 5/5/2017 | 5/5/2017 | P | PASS |
Troy Cobbley
|
|
|
Underground supply piping is ok to cover. A letter is being provide by the underground installer stating that the min. 4'6" cover has been provided for all of the piping
|