Information based on query as of Friday, May 17, 2024.
Permit Information
Permit NumberFIR17-00545
StatusFinaled
Name PHOENIX FIRE PROTECTION
Site Address 8800 W EMERALD ST
Project NameTreasure Valley Hosp MOB - TI
Customer Number 
ePlanReviewYes
Description
TI - Add and relocate FS heads to accommodate new walls and ceilings in MOB area, all piping shall remain as is unless otherwise noted.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection10/31/201810/31/201810/31/2018PPASS
DetailsTroy Cobbley
Permit finaled
INSP-Final Inspection12/12/201712/13/201712/13/2017APART
DetailsTroy Cobbley
Sprinkler work is basically complete for this scope of work in the MOB. Prior to a final a forward flush is nneded, concrete chipped out around the riser, zone map of the sprinkler system and the usual final items such as signage and tags...ect

Contact Brad Westbrook ###-#### 30 min prior to Final Insp Start please

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
INSP-Final Inspection12/7/201712/8/201712/8/2017ACANC
DetailsTroy Cobbley
Contact Brad Westbrook ###-#### 30 Min prior to Fire Final Insp start please.

ThankYOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
INSP-Sprinkler Rough-in/Hydro12/6/201712/7/201712/7/2017PPASS
DetailsTroy Cobbley
The overhead hydro for the MOB has passed and the corridor that connects the MOB to the existing hospital is ok for cover.
INSP-Sprinkler Rough-in/Hydro12/5/201712/6/201712/6/2017PCANC
DetailsTroy Cobbley
Did not perform hydro test due to pump problems

Contact Brad Westbrook ###-#### 30 min prior to OH Hydro Insp start please.

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
INSP-Sprinkler Rough-in/Hydro12/5/201712/6/201712/5/2017ACANC
DetailsTroy Cobbley
Contact Brad Westbrook ###-#### 30 min prior to OH Hydro Insp start please.

ThankYOU Phone #: ###-#### >> Inspection requested via web by Teri Cruickshank Inspection cancelled from web by: Teri Cruickshank
INSP-Sprinkler Rough-in12/1/201712/4/201712/4/2017PPASS
DetailsTroy Cobbley
The Dining Room piping and the remaining corridor system sprinkler piping is ok for cover.
INSP-Final Inspection11/30/201712/1/201712/1/2017AFAIL
DetailsTroy Cobbley
Not ready for a final yet but Corridor 199 and the Laundry Room sprinkler piping is ok to cover

Contact Brad Westbrook ###-#### 30 min prior to Fire Final insp Start please.

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
INSP-Sprinkler Rough-in11/22/201711/22/201711/22/2017PPART
DetailsTroy Cobbley
The earth quake bracing in the corridor has been corrected. Pendant heads are still overspaced in the Laundry Room. The piping in the Corridor can be covered.
INSP-Sprinkler Rough-in11/9/201711/9/201711/9/2017PPART
DetailsTroy Cobbley
See the on site as-builts for locations where sprinkler piping is ok to cover. Pendant heads are overspaced and one upright is missing in the Laundry Room. One upright head is painted in the Kitchen. Provide verification that the earthquake bracing that is attached to the Corridor wall is ok to be attached. This included lag bolts into 2x4's.

Contact Brad Westbrook ###-####
INSP-Sprinkler Rough-in11/6/201711/7/201711/7/2017APASS
DetailsTroy Cobbley
The last piping/head in the curved soffit in the DIning Area is ok to cover. I noted that upright coverage against the north wall is missing in this same location as the just approved head.
INSP-Sprinkler Rough-in11/3/201711/6/201711/6/2017ACANC
DetailsTroy Cobbley
Contact Brad Westbrook ###-#### 30 min. prior to Rough In start please.

Thank You Phone #: ###-#### >> Inspection requested via web by Teri Cruickshank Inspection cancelled from web by: Teri Cruickshank
INSP-Sprinkler Rough-in10/5/201710/6/201710/6/2017APASS
DetailsTroy Cobbley
See the city approved plans for heads marked "ok", in the hardlids, where piping is ok to cover. Fitter did not have small documents.

Contact Brad Westbrook - ###-####
INSP-Sprinkler Rough-in10/5/201710/5/201710/5/2017PFAIL
DetailsTroy Cobbley
There are no city approved plans or small documents on site for the inspection. No inspection performed.
INSP-Sprinkler Rough-in10/5/201710/5/201710/5/2017PCANC
DetailsTroy Cobbley
Contact Brad Westbrook ###-#### 30 min prior to RTC Insp Start, please insp at the same time as the UG Flush please.

Thank You Phone #: ###-#### >> Inspection requested via web by Teri Cruickshank Inspection cancelled from web by: Teri Cruickshank