INSP-Final Inspection | 10/31/2018 | 10/31/2018 | 10/31/2018 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 12/12/2017 | 12/13/2017 | 12/13/2017 | A | PART |
Troy Cobbley
|
|
|
Sprinkler work is basically complete for this scope of work in the MOB. Prior to a final a forward flush is nneded, concrete chipped out around the riser, zone map of the sprinkler system and the usual final items such as signage and tags...ect
Contact Brad Westbrook ###-#### 30 min prior to Final Insp Start please
Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
INSP-Final Inspection | 12/7/2017 | 12/8/2017 | 12/8/2017 | A | CANC |
Troy Cobbley
|
|
|
Contact Brad Westbrook ###-#### 30 Min prior to Fire Final Insp start please.
ThankYOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
INSP-Sprinkler Rough-in/Hydro | 12/6/2017 | 12/7/2017 | 12/7/2017 | P | PASS |
Troy Cobbley
|
|
|
The overhead hydro for the MOB has passed and the corridor that connects the MOB to the existing hospital is ok for cover.
|
INSP-Sprinkler Rough-in/Hydro | 12/5/2017 | 12/6/2017 | 12/6/2017 | P | CANC |
Troy Cobbley
|
|
|
Did not perform hydro test due to pump problems
Contact Brad Westbrook ###-#### 30 min prior to OH Hydro Insp start please.
Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
INSP-Sprinkler Rough-in/Hydro | 12/5/2017 | 12/6/2017 | 12/5/2017 | A | CANC |
Troy Cobbley
|
|
|
Contact Brad Westbrook ###-#### 30 min prior to OH Hydro Insp start please.
ThankYOU Phone #: ###-#### >> Inspection requested via web by Teri Cruickshank Inspection cancelled from web by: Teri Cruickshank
|
INSP-Sprinkler Rough-in | 12/1/2017 | 12/4/2017 | 12/4/2017 | P | PASS |
Troy Cobbley
|
|
|
The Dining Room piping and the remaining corridor system sprinkler piping is ok for cover.
|
INSP-Final Inspection | 11/30/2017 | 12/1/2017 | 12/1/2017 | A | FAIL |
Troy Cobbley
|
|
|
Not ready for a final yet but Corridor 199 and the Laundry Room sprinkler piping is ok to cover
Contact Brad Westbrook ###-#### 30 min prior to Fire Final insp Start please.
Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
INSP-Sprinkler Rough-in | 11/22/2017 | 11/22/2017 | 11/22/2017 | P | PART |
Troy Cobbley
|
|
|
The earth quake bracing in the corridor has been corrected. Pendant heads are still overspaced in the Laundry Room. The piping in the Corridor can be covered.
|
INSP-Sprinkler Rough-in | 11/9/2017 | 11/9/2017 | 11/9/2017 | P | PART |
Troy Cobbley
|
|
|
See the on site as-builts for locations where sprinkler piping is ok to cover. Pendant heads are overspaced and one upright is missing in the Laundry Room. One upright head is painted in the Kitchen. Provide verification that the earthquake bracing that is attached to the Corridor wall is ok to be attached. This included lag bolts into 2x4's.
Contact Brad Westbrook ###-####
|
INSP-Sprinkler Rough-in | 11/6/2017 | 11/7/2017 | 11/7/2017 | A | PASS |
Troy Cobbley
|
|
|
The last piping/head in the curved soffit in the DIning Area is ok to cover. I noted that upright coverage against the north wall is missing in this same location as the just approved head.
|
INSP-Sprinkler Rough-in | 11/3/2017 | 11/6/2017 | 11/6/2017 | A | CANC |
Troy Cobbley
|
|
|
Contact Brad Westbrook ###-#### 30 min. prior to Rough In start please.
Thank You Phone #: ###-#### >> Inspection requested via web by Teri Cruickshank Inspection cancelled from web by: Teri Cruickshank
|
INSP-Sprinkler Rough-in | 10/5/2017 | 10/6/2017 | 10/6/2017 | A | PASS |
Troy Cobbley
|
|
|
See the city approved plans for heads marked "ok", in the hardlids, where piping is ok to cover. Fitter did not have small documents.
Contact Brad Westbrook - ###-####
|
INSP-Sprinkler Rough-in | 10/5/2017 | 10/5/2017 | 10/5/2017 | P | FAIL |
Troy Cobbley
|
|
|
There are no city approved plans or small documents on site for the inspection. No inspection performed.
|
INSP-Sprinkler Rough-in | 10/5/2017 | 10/5/2017 | 10/5/2017 | P | CANC |
Troy Cobbley
|
|
|
Contact Brad Westbrook ###-#### 30 min prior to RTC Insp Start, please insp at the same time as the UG Flush please.
Thank You Phone #: ###-#### >> Inspection requested via web by Teri Cruickshank Inspection cancelled from web by: Teri Cruickshank
|