INSP-Final Inspection | 6/1/2018 | 6/4/2018 | 6/4/2018 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
Brian Phone #: ###-####
|
INSP-Final Inspection | 5/17/2018 | 5/18/2018 | 5/18/2018 | A | FAIL |
Troy Cobbley
|
|
|
Project is not ready for a final yet. Need ceiling tile installed and the approved plans to verifiy where the quick responce heads are to b e placed. There is still an issue with mixing responces.
JCI rep is Fred Virgili Phone #: ###-#### Inspection requested via web by Shane Lesteberg
|
INSP-Sprinkler Rough-in | 4/18/2018 | 4/18/2018 | 4/18/2018 | P | PASS |
Troy Cobbley
|
|
|
Tenting inspection passed. Piping can be covered.
|
INSP-Sprinkler Rough-in/Hydro | 4/11/2018 | 4/11/2018 | 4/11/2018 | P | PART |
Troy Cobbley
|
|
|
Overhead rough-in passed. I noted that the plans call for quick responce heads in the scope of work but not all heads are quick responce. I noted that a short corridor outside of the sprinkler scope of work appears to be in the building scope of work but has a standard responce head that is open to an area with quick responce heads. I noted a Storage room adjacent to the scope of work where the small room rule is being utilized which is not allowed. I noted another room in the building scope of work where two sidwall heads are located one above another and again are only standard responce. Piping is ok for cover since the above noted items can be verified at final. Tenting inspection is still needed.
Brian Phone #: ###-####
|