Permit Information
Permit NumberFIR18-00322
StatusFinaled
Name JOHNSON CONTROLS FIRE PROTECTION SE
Site Address 4455 E WARM SPRINGS AVE
Project NameAspen Valley Senior Living
Customer NumberUDG ONLY
ePlanReviewYes
Description
[Aspen Valley Senior Living - Udg Only] - Quick Permit
Install new Fire Sprinkler Underground 8"x297' ± line to supply new Fire Sprinkler System.

[BLD18-00494]
The fire sprinkler system is used for building area increase and for occupancy. The drawings are filed under permit BLD18-00494 in ePlanReview. Two permits (BLD18-00494 and BLD18-00774) apply to this project. To construct a 47,379 square foot, one story building (33,224 square feet West “building” and 14,155 square feet East “building”) to be used as an assisted living facility (50 units) and as a memory care facility (16 units and a total of 6,853 square feet). The “buildings” will be separated by a 2-hr fire-resistance-rated fire wall. Within the assisted living facilities, occupants are expected to be able to respond to an emergency situation without assistance. Within the memory care facility, occupants are expected to need assistance to respond to an emergency situation. In both facilities, the need for bed movement is not expected within or between smoke compartments (i.e. no one is confined to their bed). Work is to include concrete footings, concrete stem walls, concrete pedestals, concrete slab on grade with thickened sections to support interior bearing walls, exterior and interior wood stud walls, exterior and interior wood stud bearing walls with headers at openings, exterior and interior wood stud shear walls with hold downs, wood beams and columns, wood trussed roof system with girder trusses, wood roof sheathing, exterior windows, exterior doors, board and batten siding, lap siding, manufactured stone wainscot, wood trellis accent awnings, metal accent awnings, corrugated metal siding, asphalt shingles, standing seam metal roofing, a 6 foot tall masonry screen wall, a 6 foot tall masonry trash enclosure, and a porte cochere. Special Inspection is required for soils, concrete, shear walls, and roof diaphragms. The design for roof trusses is a deferred submittal item. Other work includes 22 Unit A assisted living units each having a toilet/shower room (375 sq. ft. each), 27 Unit B assisted living units each having a toilet/shower room (467 sq. feet each), 1 Unit D assisted living unit having a toilet/shower room (600 sq. ft.), and 16 Unit C memory care sleeping units each having a toilet room (208 sq. ft. each), a Men’s multi-user toilet room accessible to the disabled, a Women’s multi-user toilet room accessible to the disabled, two single-user toilet rooms accessible to the disabled, a commercial kitchen, a Type I grease hood and duct system, a Type II dishwasher hood and duct system, make-up air, exterior grease trap, a 2-hr fire wall to create separate buildings for building area, 1-hr smoke barrier walls to create smoke compartments, millwork, and interior finishes. At least 2 of the assisted living units are required to comply as accessible units. The rest are required to comply as Type B dwelling units. All of the memory care units will comply as accessible units. A separate permit is required for the future gazebo and trellis. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection7/31/20188/1/20187/31/2018APASS
DetailsJim Page
Fianl inspection for underground supply complete.

Phone #: ###-#### Inspection requested via web by Shane Lesteberg
INSP-Supply line flush7/25/20187/31/20187/31/2018PDONE
DetailsJim Page
Underground main line flush complete.

please call ahead // Todd Phone #: ###-####
INSP-Sprinkler Rough-in/Hydro5/29/20185/31/20185/31/2018ADONE
DetailsJim Page
Hydrostatic test for underground supply witnessed, no pressure loss observed at contractor provided gauge.

Contact is Fred Virgili Phone #: ###-#### Inspection requested via web by Shane Lesteberg
INSP-Sprinkler Rough-in5/23/20185/24/20185/24/2018PPASS
DetailsJim Page
Rough to cover inspection for underground supply complete, approved for cover.

Underground rough-in. Phone #: ###-#### Inspection requested via web by Shane Lesteberg