INSP-Final Inspection | 1/2/2019 | 1/3/2019 | 1/3/2019 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for area of work complete.
Jim Baker is the contact Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 1/2/2019 | 1/3/2019 | 1/3/2019 | A | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, rough to cover inspection complete, approved for cover.
Jim Baker is the contact Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Final Inspection | 12/27/2018 | 12/27/2018 | 12/27/2018 | P | CANC |
Jim Page
|
|
|
Project did not pass rough in inspection, not ready for final, this request is cancelled.
Contact is Jim Baker Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 12/27/2018 | 12/27/2018 | 12/27/2018 | P | FAIL |
Jim Page
|
|
|
Fire sprinkler heads are overspaced in area of work, corrections are needed.
Contact is Jim Baker Phone #: ###-#### Inspection requested via web by Stan Beus
|