INSP-Final Inspection | 3/11/2019 | 3/13/2019 | 3/13/2019 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection complete.
Phone #: ###-#### Inspection requested via web by jeremiah robison
|
INSP-Final Inspection | 2/26/2019 | 2/27/2019 | 2/27/2019 | P | FAIL |
Jim Page
|
|
|
Dry system did not meet time requirements for valve trip test.
Trip test Phone #: ###-#### Inspection requested via web by jeremiah robison
|
INSP-Final Inspection | 2/14/2019 | 2/15/2019 | 2/15/2019 | P | FAIL |
Jim Page
|
|
|
Dry pipe valve needs to be serviced, clapper did not open with inspectors test flow.
Phone #: ###-#### Inspection requested via web by jeremiah robison
|
INSP-Sprinkler Rough-in/Hydro | 2/13/2019 | 2/14/2019 | 2/14/2019 | P | DONE |
Jim Page
|
|
|
Hydrostatic test for newly installed overhead fire sprinkler piping witnessed, no pressure loss observed.
Phone #: ###-#### Inspection requested via web by jeremiah robison
|
INSP-Sprinkler Rough-in/Hydro | 2/11/2019 | 2/12/2019 | 2/12/2019 | A | CANC |
Jim Page
|
|
|
Temperature did not get above 40 degrees, hydro cancelled per conversarion with point of contact, inspection request will be rescheduled to coincide with allowable weather for hydrostatic test.
Phone #: ###-#### Inspection requested via web by jeremiah robison
|
INSP-Final Inspection | 2/4/2019 | 2/5/2019 | 2/5/2019 | A | CANC |
Jim Page
|
|
|
Still need to complete hydrostatic test for newly installed overhead sprinkler piping. (weather permitting) needs to be 40 degrees or above. This request is cancelled.
Phone #: ###-#### Inspection requested via web by Matthew Lewis
|
INSP-Sprinkler Rough-in/Hydro | 2/4/2019 | 2/5/2019 | 2/5/2019 | A | DONE |
Jim Page
|
|
|
24 hr test complete, no pressure loss observed.
24hr air test and hydro Phone #: ###-#### Inspection requested via web by Matthew Lewis
|
INSP-Sprinkler Rough-in/Hydro | 2/4/2019 | 2/4/2019 | 2/4/2019 | P | PART |
Jim Page
|
|
|
24 hour air test started at 1PM with 41 psi on new piping.
24hr air test Phone #: ###-#### Inspection requested via web by Matthew Lewis
|
INSP-Final Inspection | 2/1/2019 | 2/4/2019 | 2/4/2019 | A | FAIL |
Troy Cobbley
|
|
|
Rough-in passed for the most part. There were no small documents, will need 200lb hydro, 24 hr air, trip test....ect. prior to a final.
please give half hour notice Phone #: ###-#### Inspection requested via web by jeremiah robison
|