Permit Information
Permit NumberFIR19-00061
StatusFinaled
Name JOHNSON CONTROLS FIRE PROTECTION SE
Site Address 9339 W CORY LN
Project NameAventura West Bldg D
Customer Number 
ePlanReviewYes
Description
Install wet pipe fire sprinkler system beginning at one foot above floor in mechanical room.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection8/21/20198/22/20198/22/2019PPASS
DetailsTroy Cobbley
Permit finaled

Nick Phone #: ###-#### (change inspection to this afternoon, 8-22, per kristin dolan)
INSP-Final Inspection8/13/20198/14/20198/14/2019APART
DetailsTroy Cobbley
A temporary for this permit is being given for one week. Work that needs completed is: cover the cpvc piping in the riser rooms and in the storage closets, provide one hour riser room, provide heat in the riser room.
nick Phone #: ###-####
INSP-Sprinkler Rough-in8/12/20198/12/20198/12/2019PFAIL
DetailsJim Page
As stated with Clint, fire sprinkler plans are under review, plan mods on 01MAY2019 and 07AUG2019 were both failed, no inspection will be performed until plans are back in issued status and modification does not result in a failure.

kristen Phone #: ###-####
INSP-Sprinkler Rough-in/Hydro4/29/20194/30/20194/30/2019APASS
DetailsTroy Cobbley
The overhead hydro test was witnessed with no visible loss at the guage. Todd Phone #: ###-####
INSP-Supply line flush4/25/20194/26/20194/26/2019APASS
DetailsTroy Cobbley
Underground flush witnessed

Nick Phone #: ###-####
INSP-Sprinkler Rough-in3/7/20193/8/20193/8/2019APART
DetailsTroy Cobbley
Rough-in passed. Tenting passed. Piping can be covered. Plan mods are needed again because instead of both risers being located on the first floor closet, the first floor is in the first floor closet but the second floor riser has been relocated to the second floor closet. Also heat to the wet piping in the closets has not been addressed. We also spoke about the need for a sprinkler riser monitoring system. Nick Phone #: ###-####
INSP-Sprinkler Rough-in3/7/20193/7/20193/7/2019PFAIL
DetailsTroy Cobbley
Revised plans are not on site and there is no access to the two first floor aparatments or to the riser room due to construction work blocking the doors

Nick Phone #: ###-####
INSP-Sprinkler Rough-in2/22/20192/22/20192/22/2019PFAIL
DetailsTroy Cobbley
Could not perform inspection due to the fire sprinkler contractor not submitting plan modifications for approval yet. I did perform a conference with the builder about what could be covered and what could not. We also discussed obstructions caused by lights and the placement of smoke alarms.
Call ahead 20 minute - partial // Andy Phone #: ###-####
INSP-Sprinkler Rough-in2/11/20192/12/20192/12/2019ADONE
DetailsTroy Cobbley
Inspection was a conference for Building D. I noted that plan modifications are needed for the pipe size changes, pipe re-routing and additional heads. Also it appears separate risers are needed for the first and second floors after discussion with the plan reviewer. contact Nic Smith for schedule. Phone #: ###-#### Inspection requested via web by Shane Lesteberg