INSP-Final Inspection | 5/13/2020 | 5/13/2020 | 5/13/2020 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled.
Contact is Dan. Phone #: ###-#### Inspection requested via web by Morgan Ahten
|
INSP-Final Inspection | 5/7/2020 | 5/8/2020 | 5/8/2020 | A | FAIL |
Troy Cobbley
|
|
|
Need monitor modules installed and as-builts showing the installation of the monitor modules for the trouble signals from the dry pipe sprinkler system accelerators. Per tech they worked wednesday. This piece of equipment needs to be monitored per IFC 903.4. Also need the map updated showing all initiating devices. Need NFPA 72 Record of Completion.
Contact is Dan. Phone #: ###-#### Inspection requested via web by Morgan Ahten
|
INSP-Final Inspection | 4/16/2020 | 4/17/2020 | 4/17/2020 | A | FAIL |
Troy Cobbley
|
|
|
The office area ceiling mounted strobes are overspaced. The truss mounted strobes in the warehouse area are overspaced. No testing performed. Need ceiling installed in the NAC panel room so the smoke detector works.
Contact is Dan. Phone #: ###-#### Inspection requested via web by Morgan Ahten
|
INSP-Final Inspection | 4/16/2020 | 4/17/2020 | 4/16/2020 | A | CANC |
Troy Cobbley
|
|
|
Contact is Dan. Phone #: ###-#### >> Inspection requested via web by Morgan Ahten Inspection cancelled from web by: Morgan Ahten
|