Final | 5/15/2019 | 5/16/2019 | 5/16/2019 | A | PASS |
Brian Scoles
|
|
|
BEN ###-#### Phone #: ###-#### Inspection requested via web by Mike Almanza- combustible mantel removed- non combustible mantel installed
|
Mec-Aging Inspection | 5/7/2019 | 5/7/2019 | 5/7/2019 | | CANC |
Chad Schwendiman
|
|
|
Called and spoke with homeowner. Work is still on going
|
Conference | 2/5/2019 | 2/5/2019 | 2/5/2019 | A | DONE |
Chad Schwendiman
|
|
|
Spoke with remodel contrator. He went by the home and removed the combustable mantle and is working with the homeowner to reinstall a noncombustable mantle
|
Mec-Aging Inspection | 2/4/2019 | 2/4/2019 | 2/4/2019 | P | FAIL |
Chad Schwendiman
|
|
|
I called and spoke with Homeowner. The correction still has not been fixed. He indicated he would get with his contrator and find out when the combustables that are to close can be removed and get back with me.
|
Mec-Aging Inspection | 1/22/2019 | 1/22/2019 | 1/22/2019 | | FAIL |
Brian Scoles
|
|
|
homeowner still needs to change mantel to what we discussed and have contractor call in final
|
Mec-Aging Inspection | 10/23/2018 | 10/23/2018 | 10/23/2018 | | FAIL |
Brian Scoles
|
|
|
still needs issue with mantel addressed and called in for final inspection- no calls
|
Mec-Aging Inspection | 7/24/2018 | 7/24/2018 | 7/24/2018 | | CANC |
Brian Scoles
|
|
|
wip
|
Conference | 4/24/2018 | 4/25/2018 | 4/25/2018 | P | DONE |
Brian Scoles
|
|
|
meet home owner at noon for conference- 208- ###-####- home owner will remove combustible mantel and install non-combustible mantel at same location and install per manufactures installation instructions
|
Conference | 4/24/2018 | 4/24/2018 | 4/24/2018 | A | DONE |
Brian Scoles
|
|
|
discuss mantel location with homeowner - had conversation with homeowner- will need installation instruction onsite- homeowner will to make it up to code- will reschedule conference when has installation instructions
|
Mec-Aging Inspection | 2/28/2018 | 2/28/2018 | 2/28/2018 | | FAIL |
Brian Scoles
|
|
|
needs corrections made per fail on final inspection- this mantel was not installed with clearance needed per manufactures installation manual
|
Mec-Aging Inspection | 11/29/2017 | 11/29/2017 | 11/29/2017 | | CANC |
Alan Hauser
|
|
|
|
Mec-Aging Inspection | 8/30/2017 | 8/30/2017 | 8/30/2017 | | CANC |
Alan Hauser
|
|
|
|
Mec-Aging Inspection | 5/31/2017 | 5/31/2017 | 5/31/2017 | | CANC |
Alan Hauser
|
|
|
|
Mec-Aging Inspection | 3/1/2017 | 3/1/2017 | 3/2/2017 | | CANC |
Chad Schwendiman
|
|
|
|
Final | 10/5/2016 | 10/5/2016 | 10/5/2016 | P | FAIL |
Brian Scoles
|
|
|
Call Ben (contractor) to schedule access into the home. Ben ####-#### Inspection requested via web by Jason Robinson- mantel needs to be installed per manufacture recommendations or need to get fireplace manufacture to ok matel per home owners design to allow this in writing- need copy of determination of outcome from manufacture
|
Rough-in | 8/16/2016 | 8/16/2016 | 8/16/2016 | P | PASS |
Alan Hauser
|
|
|
|
Rough-in | 8/13/2016 | 8/16/2016 | 8/16/2016 | A | FAIL |
Alan Hauser
|
|
|
install fire resistive boards around fire place as per installation guide
|