Final | 8/30/2018 | 8/30/2018 | 8/30/2018 | A | PASS |
Brian Scoles
|
|
|
final ok
|
Conference | 8/29/2018 | 8/30/2018 | 8/30/2018 | A | PASS |
Brian Scoles
|
|
|
Inspection requested via web by Asim Smajlovic- furnace a/c bath exhaust co ok
|
Final | 7/1/2018 | 7/2/2018 | 7/2/2018 | A | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Asim Smajlovic- need to add pvc on secondary drain to within 6" of floor- need uv protection on lineset outside and support lineset off concrete
|
Conference | 6/8/2018 | 6/8/2018 | 6/8/2018 | P | CANC |
Brian Scoles
|
|
|
Inspection requested via web by Asim Smajlovic- per phone call with Oleg
|
Rough-in | 10/31/2017 | 10/31/2017 | 10/31/2017 | P | PASS |
Alan Hauser
|
|
|
|
Final | 10/31/2017 | 10/31/2017 | 10/31/2017 | P | NR |
Alan Hauser
|
|
|
still need c.o. detectors installed
|