Final | 4/17/2019 | 4/17/2019 | 4/17/2019 | P | PASS |
Ben Livingston
|
|
|
if questions call Steve @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann
|
Final | 4/1/2019 | 4/2/2019 | 4/2/2019 | A | PART |
Ben Livingston
|
|
|
All floors ready for Mechanical Final. If questions call Steve @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann part final, 4 units in stairwells remain
|
Rough-in | 3/1/2019 | 3/4/2019 | 3/4/2019 | A | PASS |
Ben Livingston
|
|
|
ceiling cover 3rd ; 4th floors. if questions call Steve @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann 3rd and 4th floor Area1-9 okay 9-10 remain
|
Rough-in | 2/19/2019 | 2/21/2019 | 2/21/2019 | A | PASS |
Ben Livingston
|
|
|
1st ; 2nd floor mechanical ceiling cover. if questions call Donny @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann 1st 2nd floor pass
|
Pressure Test | 2/4/2019 | 2/5/2019 | 2/5/2019 | P | PASS |
Ben Livingston
|
|
|
before 4:30pm. Pressure Test on Penthouse Chilled ; Glycol Loops. If questions call Donny @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann 100lb hydronics penthouse, final connections gas to boilers penthouse
|
Pressure Test | 1/23/2019 | 1/24/2019 | 1/24/2019 | P | PASS |
Ben Livingston
|
|
|
west ; east LL-1 ; LL-3 CUH ; UH 100# pressure test. if questions call Donny @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann 100lb hydronic
|
Pressure Test | 1/23/2019 | 1/23/2019 | 1/23/2019 | P | PASS |
Ben Livingston
|
|
|
Hydronic Pressure Test - Penthouse heating pump. If questions call Donny @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann hydronic in penthouse 100lb x2
|
Pressure Test | 1/15/2019 | 1/16/2019 | 1/16/2019 | A | PASS |
Ben Livingston
|
|
|
pressure test on 2# gas main from meter to penthouse ; boilers, ; low pressure gas from meter to kitchen. If questions call Donny @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann 60lb on 2" main, 20lb on kitchen line
|
Pressure Test | 12/20/2018 | 12/20/2018 | 12/20/2018 | P | PASS |
Ben Livingston
|
|
|
4th Hydronic mains ; branches to bypass 100#test. If questions call Donny @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann 4th floor 100lb hydronics
|
Pressure Test | 12/17/2018 | 12/17/2018 | 12/17/2018 | P | PASS |
Ben Livingston
|
|
|
hydronic pressure test - 3rd floor main loop to bypass. if questions call Donny @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann 100 lb x2 3rd floor loop
|
Pressure Test | 11/1/2018 | 11/2/2018 | 11/2/2018 | A | PASS |
Ben Livingston
|
|
|
pressure test - 3rd floor hydronic mains and branches to VAV''s and shaft risers. If questions call Donny @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann 100lb
|
Pressure Test | 10/2/2018 | 10/2/2018 | 10/2/2018 | P | PASS |
Ben Livingston
|
|
|
LL-1 ; L-1 Hydronic 35# pressure test through fin tubes ; units. If questions call Donny @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann 35lb test all fin tubes ll1 l1
|
Pressure Test | 9/20/2018 | 9/21/2018 | 9/21/2018 | A | PASS |
Ben Livingston
|
|
|
Pressure test gas main through 4th floor, if questions call Donny @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann 60lb gas main to 4th floor
|
Pressure Test | 9/21/2018 | 9/21/2018 | 9/21/2018 | P | PASS |
Ben Livingston
|
|
|
Pressure test ll1 fintubes 100lb test
|
Pressure Test | 9/7/2018 | 9/7/2018 | 9/7/2018 | P | PASS |
Ben Livingston
|
|
|
1st floor. If questions call Donny @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann 1st floor 11/4" gas line and kitchen 20lb
|
Pressure Test | 8/21/2018 | 8/22/2018 | 8/22/2018 | A | PART |
Ben Livingston
|
|
|
if questions call Steve @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann 20lb test on 11/4" gas pipe in wall for kitchen, need a 30lb gauge
|
Pressure Test | 7/12/2018 | 7/13/2018 | 7/13/2018 | A | PASS |
Ben Livingston
|
|
|
If questions call Donny @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann 2nd floor 100lb hydronic test x2
|
Pressure Test | 7/5/2018 | 7/9/2018 | 7/9/2018 | A | FAIL |
Ben Livingston
|
|
|
L.L.-1, ; L-1, ; shaft piping, hydronic pressure test. If questions call Donny @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann walked parking garage and first floor hydronic 2 100lb tests, need approved plans on sight to pass inspection
|