Final | 4/23/2019 | 4/24/2019 | 4/24/2019 | A | PASS |
Ben Livingston
|
|
|
PAT IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
Final | 3/21/2019 | 3/22/2019 | 3/22/2019 | A | PART |
Ben Livingston
|
|
|
PAT IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER temp C.O. phase 1
|
Rough-in | 2/4/2019 | 2/5/2019 | 2/5/2019 | A | PART |
Ben Livingston
|
|
|
PAT IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER 20lb gas
|
Pressure Test | 2/5/2019 | 2/5/2019 | 2/5/2019 | P | PASS |
Ben Livingston
|
|
|
PAT IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER 20lb welded gas pipe in mechanical room
|
Rough-in | 1/15/2019 | 1/16/2019 | 1/16/2019 | A | NR |
Ben Livingston
|
|
|
PAT IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER changed to pressure test, condensate not ready
|
Pressure Test | 1/16/2019 | 1/16/2019 | 1/16/2019 | P | PASS |
Ben Livingston
|
|
|
PAT IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER gas piping to all RTUs on roof, and water heater in mec room, all piping on roof not used for temp heat need to be end capped closed
|