Final | 3/21/2019 | 3/21/2019 | 3/21/2019 | P | PASS |
Jack Reynolds
|
|
|
final Phone #: ###-#### Inspection requested via web by Brandon Sorensen - final ok
|
Mec-Aging Inspection | 3/21/2019 | 3/21/2019 | 3/21/2019 | | DONE |
Jack Reynolds
|
|
|
Called TVR and left Brandon Sorensen a voicemail about their mechanical aging permit. There was a few items left to see on this project if they are finished schedule inspection.
|
Rough-in | 12/14/2018 | 12/17/2018 | 12/17/2018 | A | PASS |
Jack Reynolds
|
|
|
unit heater cover Phone #: ###-#### Inspection requested via web by Brandon Sorensen - mini split R/I at front entry ok- cover ok
|
Final | 10/22/2018 | 10/22/2018 | 10/22/2018 | P | PART |
Jack Reynolds
|
|
|
FINAL - CALL RANDY Phone #: ###-#### Inspection requested via web by Brandon Sorensen- refrigeration lines ok - still need to see charging station for lifts finished- still need to see rough in on a mini split at front of building GC is working on getting started- TEMP OCC ok- no card to sign onsite
|
Rough-in | 8/28/2018 | 8/28/2018 | 8/28/2018 | A | PART |
Jack Reynolds
|
|
|
Banana rooms exhaust system - exhaust system with make up air for banana rooms ok- refrigeration insulation on top of cooler still needs some work- refrigeration line penetration needs sealed at evaporater -refrigeration lines outside need UV protection- ductless split on east side of building for IT room ok- supply runs in SE office space ok- there will be one more ductless split installed later need to see this for full R/I -charging station duct work 90% done -
|
Final | 8/27/2018 | 8/28/2018 | 8/28/2018 | A | CANC |
Jack Reynolds
|
|
|
Partial Final for banana room Phone #: ###-#### Inspection requested via web by Brandon Sorensen-
|
Rough-in | 7/25/2018 | 7/26/2018 | 7/26/2018 | A | PART |
Jack Reynolds
|
|
|
call jeremy Phone #: ###-#### Inspection requested via web by Brandon Sorensen- duct work for forklift charging station exhaust ok
|