Final | 10/23/2018 | 10/23/2018 | 10/23/2018 | P | PASS |
Ben Livingston
|
|
|
Preston Phone #: ###-####
|
Final | 10/19/2018 | 10/19/2018 | 10/19/2018 | P | FAIL |
Ben Livingston
|
|
|
Presten Phone #: ###-#### need balance report, line set needs more uv tape
|
Rough-in | 8/8/2018 | 8/9/2018 | 8/9/2018 | P | PASS |
Ben Livingston
|
|
|
Preston Phone #: ###-####
|
Pressure Test | 8/6/2018 | 8/7/2018 | 8/7/2018 | A | PASS |
Ben Livingston
|
|
|
Preston Phone #: ###-#### 20lb gas, 5lb flue
|
Rough-in | 8/6/2018 | 8/7/2018 | 8/7/2018 | A | FAIL |
Ben Livingston
|
|
|
Preston Phone #: ###-#### crawl needs to be complete, gas pipe buy furnace needs a nail plate, dryer vent needs to be 4" diamiter wall needs to be furred out, need approved manual J need 6" fresh air
|