Final | 9/25/2019 | 9/25/2019 | 9/25/2019 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Jose Lagunas- final ok
|
Mec-Aging Inspection | 7/4/2019 | 7/4/2019 | 7/5/2019 | | CANC |
Chad Schwendiman
|
|
|
Work on going
|
Rough-in | 4/4/2019 | 4/5/2019 | 4/5/2019 | A | NH |
Brian Scoles
|
|
|
Rough in and pressure test Phone #: ###-#### Inspection requested via web by Jose Lagunas-no access
|
Rough-in | 8/29/2018 | 8/30/2018 | 8/30/2018 | A | PASS |
Brian Scoles
|
|
|
Jose Phone #: ###-####- R/I ok
|
Rough-in | 8/27/2018 | 8/27/2018 | 8/27/2018 | P | FAIL |
Brian Scoles
|
|
|
Jose Phone #: ###-####- all register cans/boots need to be sealed with mastic- need to fix all rips and tears in arma flex from furnace to exterior location- left correction notice front window
|