Final | 12/27/2018 | 12/28/2018 | 12/28/2018 | A | PASS |
Ben Livingston
|
|
|
Doug Phone #: ###-####
|
Final | 12/27/2018 | 12/27/2018 | 12/27/2018 | P | FAIL |
Ben Livingston
|
|
|
Doug Phone #: ###-#### need balance report
|
Pressure Test | 10/31/2018 | 10/31/2018 | 10/31/2018 | P | PASS |
Ben Livingston
|
|
|
Gas pressure test for underground gas piping. Phone #: ###-#### Inspection requested via web by Bryan Palmer 60lb, piping
|
Pressure Test | 10/30/2018 | 10/30/2018 | 10/30/2018 | P | PASS |
Ben Livingston
|
|
|
Pressure test for geothermal ground-loop. Phone #: ###-#### Inspection requested via web by Bryan Palmer 100lb hydronic from ground loop to house
|
Rough-in | 10/8/2018 | 10/8/2018 | 10/8/2018 | P | PASS |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by Bryan Palmer
|
Rough-in | 10/4/2018 | 10/5/2018 | 10/5/2018 | P | FAIL |
Ben Livingston
|
|
|
Mike ###-#### Phone #: ###-#### Inspection requested via web by Bryan Palmer need 6" fresh air to return plenum, also need to permit garage addition
|
Pressure Test | 10/4/2018 | 10/5/2018 | 10/5/2018 | P | PASS |
Ben Livingston
|
|
|
Mike ###-#### Phone #: ###-#### Inspection requested via web by Bryan Palmer 20lb 5lb flue
|