Permit Information
Permit NumberMEC18-05047
StatusFinaled
Name YMC INC
Site Address 8485 S FEDERAL WAY
Project Name 
Customer Number2107291
ePlanReviewNo
Description
New: UNIT HTR, VENTING, GAS PIPE
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final1/28/20191/28/20191/28/2019PPASS
DetailsJack Reynolds
Please call Russ, thank you! Phone #: ###-#### Inspection requested via web by Rhonda Marcum
- final ok
- no card to signed onsite job shack was locked up
Final1/23/20191/23/20191/23/2019PPART
DetailsJack Reynolds
Please call Russ, Thank YOU! Phone #: ###-#### Inspection requested via web by Rhonda Marcum
- need to see guardrails installed at roof access
Final1/18/20191/22/20191/22/2019AFAIL
DetailsTroy James
Please call Russ, Thank YOU!! Phone #: ###-#### Inspection requested via web by Rhonda Marcum
Need to install sediment trap after shutoff valve and before regulator. Need to install test port after the regulator. The roof hatch is required to have a guardrail per code section 304.11 IMC.
Pressure Test1/3/20191/4/20191/4/2019APASS
DetailsJack Reynolds
Please call Dan, thank you! Phone #: ###-#### Inspection requested via web by Rhonda Marcum
- 60lb gas pressure test ok for suite 110 center of building
Rough-in12/7/201812/7/201812/7/2018PPASS
DetailsJack Reynolds
- UH 5-8 R/I ok
- gas piping and pressure test for the south half of the warehouse ok
- The gas regulator being used are ventless
Pressure Test12/6/201812/7/201812/7/2018APASS
DetailsJack Reynolds
Please call Dan, Thank YOU! Phone #: ###-#### Inspection requested via web by Rhonda Marcum
60lb gas pressure test ok- gtagged meter bar
Rough-in12/4/201812/6/201812/6/2018APART
DetailsJack Reynolds
Please call Russ with any questions. Thank YOU! Phone #: ###-#### Inspection requested via web by Rhonda Marcum
- gas piping, unit heaters and venting R/I ok on UH 1-4 only north side of shell and core- gas regulator will need to be vented out the roof spec say max length of 15'- crew is working on gas piping for the south side UH 5-8- electric heater R/I ok
Pressure Test12/5/201812/6/201812/6/2018APASS
DetailsJack Reynolds
Please call Dan, Thank YOU! Phone #: ###-#### Inspection requested via web by Rhonda Marcum
- 60lb gas pressure test on north side gas piping ok- gas reg will need to be vented out the roof