Final | 11/15/2019 | 11/15/2019 | 11/15/2019 | A | PASS |
Brian Scoles
|
|
|
final ok
|
Pressure Test | 11/6/2019 | 11/6/2019 | 11/6/2019 | P | PASS |
Brian Scoles
|
|
|
hydronic pressure test - if questions call Ryan @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann- 100lb hydronic test pass supply and return
|
Mec-Aging Inspection | 10/25/2019 | 10/25/2019 | 10/25/2019 | | FAIL |
Brian Scoles
|
|
|
needs called in for inspection when works complete
|
Rough-in | 7/26/2019 | 7/26/2019 | 7/26/2019 | A | PASS |
Brian Scoles
|
|
|
condensate drains installed- phase 2 temp occupancy ok
|
Pressure Test | 7/24/2019 | 7/25/2019 | 7/25/2019 | A | PASS |
Brian Scoles
|
|
|
hydronic piping pressure test. if questions call Ryan @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann- hydronic test pass
|
Mec-Request for Extension | 7/8/2019 | 7/8/2019 | 7/8/2019 | P | PASS |
Brian Scoles
|
|
|
WIP - Phase 2 is still going and this will have inspections soon. Thanks Phone #: ###-#### Inspection requested via web by Stacia Haumann- extension ok- call in inspection when ready
|
Mec-Aging Inspection | 7/8/2019 | 7/8/2019 | 7/8/2019 | | CANC |
Brian Scoles
|
|
|
no activity
|