Final | 12/14/2018 | 12/17/2018 | 12/17/2018 | A | PASS |
Jack Reynolds
|
|
|
Please do final while out there for pressure test, Thank you
Please call Paul (J;D tech) (###-####) 30 minutes prior to showing up. Paul will need to get set up for the test. Thank you Phone #: ###-#### Inspection requested via web by Tyler Collado - furnace ac coil co ok
|
Pressure Test | 12/14/2018 | 12/17/2018 | 12/17/2018 | A | PASS |
Jack Reynolds
|
|
|
Please call Paul (J;D tech) (###-####) 30 minutes prior to showing up. Paul will need to get set up for the test. Thank you Phone #: ###-#### Inspection requested via web by Tyler Collado - 5lb flue ok
|