Final | 5/17/2019 | 5/17/2019 | 5/17/2019 | P | PASS |
Ben Livingston
|
|
|
Kevin Phone #: ###-####
|
Final | 5/8/2019 | 5/8/2019 | 5/8/2019 | P | FAIL |
Ben Livingston
|
|
|
Kevin Phone #: ###-#### 2nd condensate drain needs to be ran, arma flex needs U.V. protection
|
Rough-in | 12/27/2018 | 12/28/2018 | 12/28/2018 | A | PASS |
Ben Livingston
|
|
|
Kevin Phone #: ###-####
|
Rough-in | 12/27/2018 | 12/27/2018 | 12/27/2018 | P | FAIL |
Ben Livingston
|
|
|
Kevin Phone #: ###-#### need nailplate at top plate on dryer vent
|
Rough-in | 12/20/2018 | 12/20/2018 | 12/20/2018 | P | FAIL |
Ben Livingston
|
|
|
Kevin Phone #: ###-#### need approved manual J on site for rough-in inspection. dryer vent needs nailplate at top plate. plastic tubing isnt approved condensate material. make sure there is combustion air in furnace - w/h closet
|
Pressure Test | 12/20/2018 | 12/20/2018 | 12/20/2018 | P | PART |
Ben Livingston
|
|
|
Kevin Phone #: ###-#### 20lb 5lb flue furnace okay W/H flue at zero
|