Information based on query as of Thursday, May 9, 2024.
Permit Information
Permit NumberMEC19-00094
StatusFinaled
Name YMC INC
Site Address 4410 N CHRISTINE ST
Project Name4410 N. Christine St.
Customer Number3715611
ePlanReviewNo
Description
Alteration or Repair: Install Furnace, AC, demo and complete ducting. supply return duct, bath exhaust, range hood and dryer exhaust
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final5/24/20195/24/20195/24/2019PPASS
DetailsBrian Scoles
light switch has been installed in attic with light
Final5/8/20195/9/20195/9/2019AFAIL
DetailsBrian Scoles
Please call homeowner 30 minutes in advance for access at ###-#### and call Ryan with any questions at ###-####. Thank you Phone #: ###-#### Inspection requested via web by Lea Briggs- attic access needs electrical light and switch installed
Final4/22/20194/23/20194/23/2019ACANC
DetailsBrian Scoles
Please call homeowner 30 minutes in advance for access at ###-#### and call Ryan with any questions at ###-####. Thank you Phone #: ###-#### Inspection requested via web by Lea Briggs- per phone call with Ryan no air balance report will reschedule when completed
Rough-in1/22/20191/23/20191/23/2019PPASS
DetailsBrian Scoles
Front door is open, please call Val 30 minutes in advance at ###-#### and call Ryan with any questions at ###-####. Thank you Phone #: ###-#### Inspection requested via web by Lea Briggs- R/I ok- need 3 screws in b vent to furnace in attic by final- need to seal inside of return 1st floor in furnace closet has big holes by final- need to support R/A duct in attic to roof trusses accross access to furnace location has big sag by final- will look at these issues at final- ok to cover
Rough-in1/17/20191/17/20191/17/2019PFAIL
DetailsBrian Scoles
Front door is open, worker in back yard, please call Val 30 minutes in advance when on way at ###-#### and call Ryan with questions at ###-####. Thank you Phone #: ###-#### Inspection requested via web by Lea Briggs- range duct ran backwards- w/h b vent needs insulation shield in attic with fire stop installed with 1" clearance- need to seal end cap in chase second floor and finish tap to wall- need to seal r/a duct end cap 1st floor- all b vent needs 1" clearance to combustibles at roof level- need to add other(supply and R/A duct), dryer exhaust, range hood and 1 bath fan to permit and pay fees by final- correction notice posted inside front door left hand side on nail
Rough-in1/16/20191/17/20191/17/2019ANH
DetailsBen Livingston
Please call contractor 30 minutes in advance for access at ###-#### and call Ryan with any questions at ###-####. Thank you Phone #: ###-#### Inspection requested via web by Lea Briggs
no answer
Conference1/10/20191/10/20191/10/2019ANR
DetailsBen Livingston
11 AM inspection requested please, flue test, please call installer 30 minutes in advance at ###-####. Thank you Phone #: ###-#### Inspection requested via web by Lea Briggs
mec walk through
Pressure Test1/10/20191/10/20191/10/2019APASS
DetailsBen Livingston
11 AM inspection requested please, please call installer 30 minutes in advance at ###-####. Thank you Phone #: ###-#### Inspection requested via web by Lea Briggs
20lb gas 5lb flue