Final | 6/12/2019 | 6/13/2019 | 6/13/2019 | A | PASS |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Oleg Chervak - BLD A final ok - card signed
|
Rough-in | 3/6/2019 | 3/7/2019 | 3/7/2019 | P | PASS |
Jack Reynolds
|
|
|
south side building A pre rock partial inspection Phone #: ###-#### Inspection requested via web by Oleg Chervak - R/I ok on north and south units
|
Rough-in | 3/4/2019 | 3/4/2019 | 3/4/2019 | P | PART |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Oleg Chervak - BLD A north side 12 only R/I ok - contractor is still working on the south 12
|
Rough-in | 3/4/2019 | 3/5/2019 | 3/4/2019 | A | CANC |
Jack Reynolds
|
|
|
building A NORTH-SIDE DUCTS Phone #: ###-#### >> Inspection requested via web by Oleg Chervak Inspection cancelled from web by: Oleg Chervak
|
Rough-in | 1/15/2019 | 1/15/2019 | 1/15/2019 | P | FAIL |
Jack Reynolds
|
|
|
12 units // Oleg Phone #: ###-#### - scheduled wrong permit should have been bld c
|
Rough-in | 1/9/2019 | 1/10/2019 | 1/10/2019 | A | PART |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Oleg Chervak - BLD A pre cover R/I ok on exhaust and line sets
|