Final | 3/27/2019 | 3/28/2019 | 3/28/2019 | A | PASS |
Ben Livingston
|
|
|
If front door is locked, key is under wood block next to front door. Home is unoccupied. Phone #: ###-#### Inspection requested via web by Floyd Floyd Peek
|
Rough-in | 2/14/2019 | 2/14/2019 | 2/14/2019 | P | PASS |
Ben Livingston
|
|
|
Back door is unlocked, Manual-j is on furnace. Phone #: ###-#### Inspection requested via web by Floyd Floyd Peek
|
Rough-in | 2/13/2019 | 2/13/2019 | 2/13/2019 | P | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Floyd Floyd Peek- man j doesnt match R/A installed- seal all boots return and supply- fresh air needs ran- transfers in all bedrooms need completed- need to insulate supply duct in attic 2 places bare metal showing on wye branches- left notice back window
|
Pressure Test | 2/1/2019 | 2/4/2019 | 2/4/2019 | A | PASS |
Ben Livingston
|
|
|
Back door will be unlocked after 9:30 Phone #: ###-#### Inspection requested via web by Floyd Floyd Peek 20lb 5lb flue
|
Rough-in | 2/4/2019 | 2/4/2019 | 2/4/2019 | P | FAIL |
Ben Livingston
|
|
|
Back door will be unlocked after 9:30 Phone #: ###-#### Inspection requested via web by Floyd Floyd Peek need to submit accareport for approval, all duct work in crawl needs to be brought up to current energy code, need return path to all bedrooms
|
Rough-in | 2/1/2019 | 2/4/2019 | 2/1/2019 | A | CANC |
Ben Livingston
|
|
|
Back door will be unlocked after 9:30 Phone #: ###-#### >> Inspection requested via web by Floyd Floyd Peek Inspection cancelled from web by: Floyd Floyd Peek
|