Information based on query as of Thursday, May 16, 2024.
Permit Information
Permit NumberMEC19-00556
StatusFinaled
Name THE HEATING AND COOLING COMPANY
Site Address 1818 N 29TH ST
Project NameSchward addition
Customer Number 
ePlanReviewNo
Description
Addition-adding new HVAC system, new duct for entire house and addition, G/P to new furnace & W/H (not installing the w/h someone else is) off exsiting gas system
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final3/22/20193/25/20193/25/2019APASS
DetailsBen Livingston
Phone #: ###-#### Inspection requested via web by Bob Ferrin
Final3/21/20193/22/20193/22/2019AFAIL
DetailsBen Livingston
Phone #: ###-#### Inspection requested via web by Bob Ferrin
conduit to condencer needs to be water tight conduit
Pressure Test3/3/20193/4/20193/4/2019PPASS
DetailsBen Livingston
Phone #: ###-#### Inspection requested via web by Bob Ferrin
Pressure Test2/27/20192/28/20192/28/2019ACANC
DetailsBen Livingston
This inspection was scheduled for today 2/27, and the inspector put a disposition of NR, when in reality it was ready. 3 other guys on site said he walked in, poked his head in the bathroom for five seconds and walked out. Didn''t ask where the HVAC guy is, where the furnace is, didn''t call me, nothing. And this is the same inspector that did the rough in so he knows where everything is. It is ready for a pressure test and I expect it to get inspected >> Inspection requested via web by Bob Ferrin Inspection cancelled from web by: Bob Ferrin
Pressure Test2/27/20192/27/20192/27/2019PNR
DetailsBen Livingston
Phone #: ###-#### Inspection requested via web by Bob Ferrin
Pressure Test2/26/20192/27/20192/27/2019ACANC
DetailsBen Livingston
Phone #: ###-#### >> Inspection requested via web by Bob Ferrin Inspection cancelled from web by: Bob Ferrin
Rough-in2/7/20192/8/20192/8/2019APASS
DetailsBen Livingston
Phone #: ###-#### Inspection requested via web by Bob Ferrin