Final | 4/3/2019 | 4/3/2019 | 4/3/2019 | P | PASS |
Brian Scoles
|
|
|
Francisco is contact ###-#### Phone #: ###-#### Inspection requested via web by Dan Flaherty- final ok- card signed
|
Rough-in | 3/18/2019 | 3/19/2019 | 3/19/2019 | A | PASS |
Brian Scoles
|
|
|
Francisco is your contact Phone #: ###-#### Inspection requested via web by Kim Adams- R/I ok- condensate and linear diffusers ok- ok to cover all areas
|
Rough-in | 3/1/2019 | 3/4/2019 | 3/4/2019 | A | PART |
Brian Scoles
|
|
|
Rough in - Francisco is your contact Phone #: ###-#### Inspection requested via web by Kim Adams- need to run condensate drain in 3/4" diameter and remove pvc material not plenum rated- front area ok to sheetrock- will look at linear diffusers when installed thru access doors
|