Final | 3/20/2019 | 3/20/2019 | 3/20/2019 | A | PASS |
Brian Scoles
|
|
|
20lb gas pass undeground- ok to back fill
|
Pressure Test | 3/19/2019 | 3/19/2019 | 3/19/2019 | P | FAIL |
Brian Scoles
|
|
|
Please call Andy at 208-95-6083 for any questions. Phone #: ###-#### Inspection requested via web by Rusty Karel- steel piping in ground needs to be direct burial piping- piping installed is steel pipe with 10 mil tape whole line- replace and retest when installed
|