Final | 6/11/2019 | 6/11/2019 | 6/11/2019 | P | PASS |
Jack Reynolds
|
|
|
Inspection requested via web by Floyd Floyd Peek - final ok
|
Rough-in | 3/29/2019 | 4/1/2019 | 4/1/2019 | A | PASS |
Jack Reynolds
|
|
|
Manual-j is attached to lineset Phone #: ###-#### Inspection requested via web by Floyd Floyd Peek - R/I ok - tagged meter location
|
Rough-in | 3/28/2019 | 3/29/2019 | 3/29/2019 | A | FAIL |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Floyd Floyd Peek - need man J. onsite and stamped
|
Pressure Test | 3/28/2019 | 3/29/2019 | 3/29/2019 | A | PASS |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Floyd Floyd Peek - 20lb gas pressure test ok -5lb flue pressure test ok
|