Final | 6/26/2019 | 6/27/2019 | 6/27/2019 | P | PASS |
Brian Scoles
|
|
|
Mechanical Final Inspection needed for Bella Donna Salon please call Karl with any questions ###-#### Brian Scoles was sent the air balance report via email at 11:59 Am on 06/26/2019 Phone #: ###-#### Inspection requested via web by Karl Hestekin- final ok
|
Rough-in | 4/23/2019 | 4/23/2019 | 4/23/2019 | A | PASS |
Brian Scoles
|
|
|
Karl ###-#### Inspection cancelled from web by: Karl Hestekin- R/I ok- will check outside air, walkable platform framing in attic and air balance at final
|