Final | 6/20/2019 | 6/21/2019 | 6/21/2019 | A | PASS |
Chad Schwendiman
|
|
|
Heath Phone #: ###-####
|
Rough-in | 4/22/2019 | 4/23/2019 | 4/23/2019 | A | PASS |
Brian Scoles
|
|
|
Heath Phone #: ###-####- R/I ok- call in final when unit heaters installed
|
Pressure Test | 4/19/2019 | 4/19/2019 | 4/19/2019 | P | PASS |
Brian Scoles
|
|
|
Just a gas line pressure test witness for a unit heater. Super simple. Phone #: ###-#### Inspection requested via web by Heath Taylor- 20lb gas pass- tagged gas line
|
Rough-in | 4/19/2019 | 4/19/2019 | 4/19/2019 | P | FAIL |
Brian Scoles
|
|
|
Just a gas line pressure test witness for a unit heater. Super simple. Phone #: ###-#### Inspection requested via web by Heath Taylor- need csst approved nail plates from manufacture at top plate and fire blocking in wall- need inert tape on penetration thru building wall- whos doing unit heater install?- drip leg on gas line needs to be after shtoff valve and between appliance- b vent doesnt have 1" clearance at roof and needs an insulation shield installed- unit heater needs added to this permit if you did work
|