Final | 7/23/2019 | 7/23/2019 | 7/23/2019 | A | PASS |
Ben Livingston
|
|
|
manual-j and air balance reports are with upstairs furnace. Phone #: ###-#### Inspection requested via web by Floyd Floyd Peek
|
Pressure Test | 7/18/2019 | 7/18/2019 | 7/18/2019 | P | PASS |
Ben Livingston
|
|
|
Moved gas pipe. Phone #: ###-#### Inspection requested via web by Floyd Floyd Peek -20lb-
|
Pressure Test | 4/22/2019 | 4/23/2019 | 4/23/2019 | A | PASS |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by Floyd Floyd Peek 20 lb gas, talked with G.C. about gas meter location 3' away from electrical panel,and making 1 window inoperable
|
Rough-in | 4/22/2019 | 4/23/2019 | 4/23/2019 | A | PASS |
Ben Livingston
|
|
|
Manual-j is connected to downstairs thermostat wire. Phone #: ###-#### Inspection requested via web by Floyd Floyd Peek 5lb flue rough-in pass
|