Final | 11/1/2019 | 11/4/2019 | 11/4/2019 | A | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by GREGORY ANDERSEN
|
Card not on site to sign | 11/4/2019 | 11/4/2019 | 11/4/2019 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by GREGORY ANDERSEN
|
Final | 10/14/2019 | 10/15/2019 | 10/15/2019 | P | FAIL |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by GREGORY ANDERSEN - for mechanical ventalation, fans need to be wired to run continuously--- not wired to a switch -
|
Final | 10/10/2019 | 10/14/2019 | 10/14/2019 | A | FAIL |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by GREGORY ANDERSEN -95% of units were locked and I had no access
- a few units I was able to access still need fans wired to run continuously
|
Final | 10/10/2019 | 10/10/2019 | 10/10/2019 | P | PART |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by GREGORY ANDERSEN-Need to wire all continous running fans.
|
Rough-in | 6/7/2019 | 6/7/2019 | 6/7/2019 | P | PASS |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by GREGORY ANDERSEN - R/I ok
|
Rough-in | 6/6/2019 | 6/6/2019 | 6/6/2019 | P | FAIL |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by GREGORY ANDERSEN - need approved city stamped plans onsite - 1st floor unit on east side has line sets with rips that need repaired - 1st floor unit has a condensate line ran vertical for about 3' then graded down to drain. Just need more information on whats being done with this condensate line - transfers need to be relocated from current position to transfer to the bathroom not the hallway
|
Rough-in | 5/31/2019 | 6/3/2019 | 6/3/2019 | A | CANC |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by GREGORY ANDERSEN-Plans still under review.
|
Rough-in | 5/24/2019 | 5/24/2019 | 5/24/2019 | P | NR |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by GREGORY ANDERSEN-Plans are still under review.
|
Rough-in | 4/30/2019 | 5/1/2019 | 5/1/2019 | A | FAIL |
Eric Strole
|
|
|
3rd floor please Phone #: ###-#### Inspection requested via web by GREGORY ANDERSEN-Need to install exhaust fans and dryer vents in laundry rooms per the approved plans.
|
Rough-in | 4/30/2019 | 5/1/2019 | 4/30/2019 | A | CANC |
Eric Strole
|
|
|
2ND & 3RD FLOORS PLEASE Phone #: ###-#### >> Inspection requested via web by GREGORY ANDERSEN Inspection cancelled from web by: GREGORY ANDERSEN
|
Rough-in | 4/26/2019 | 4/29/2019 | 4/29/2019 | A | FAIL |
Ben Livingston
|
|
|
3rd floor please Phone #: ###-#### Inspection requested via web by GREGORY ANDERSEN 1 line sets need hangers 2 dryervents not run 3 fans in laundry room not installed
|