StatusFinaled
Name AUTOMATIC AIR
Site Address 6518 W RUSSETT ST
Project Name 
Customer Number 
ePlanReviewNo
Description
Complete HVAC Installation: Complete HVAC system install, including gas piping, and venting plus bath, kitchen and dryer vents.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final7/25/20197/26/20197/26/2019APASS
DetailsBrian Scoles
Air balance has been completed and passed - line-set out by A/C insulated and taped with UV approved, drain 90* has been put on. Thank you !! Phone #: ###-#### Inspection requested via web by Bruce Lacy- final ok
Final7/24/20197/24/20197/24/2019PFAIL
DetailsBrian Scoles
Builder should have floor registers in.. they or on site Phone #: ###-#### Inspection requested via web by Bruce Lacy- need uv protection on arma flex outside and extend arma flex bare copper showing- need 3/4" 90 degree on pvc condensate drain outside- need to seal both outside penetrations weather tight- need air balance performed and report onsite
Rough-in5/9/20195/10/20195/10/2019APASS
DetailsBrian Scoles
All corrections made, should be good to go. Phone #: ###-#### Inspection requested via web by Bruce Lacy- R/I ok- appliances will be set on final
Rough-in5/9/20195/9/20195/9/2019PFAIL
DetailsBrian Scoles
All floor registers are plated over with OSB.. I will leave one open at front of house and a cordless impact at furnace location if you want to remove more. The drop cover will be just laying over the openings in the floor. Phone #: ###-#### Inspection requested via web by Bruce Lacy- need approved man j onsite stamped from city- need insulation shield- need to fix all rips in arama flex- need combustion air for furnace closet- need to strap duct in crawl minimum of 4 inches off earth- went over with contractor onsite
Pressure Test5/9/20195/9/20195/9/2019PPASS
DetailsBrian Scoles
All floor registers are plated over with OSB.. I will leave one open at front of house and a cordless impact at furnace location if you want to remove more. The drop cover will be just laying over the openings in the floor. Phone #: ###-#### Inspection requested via web by Bruce Lacy- 20lb gas pass- tagged gas line
Rough-in5/7/20195/8/20195/8/2019ACANC
DetailsBrian Scoles
Bruce Phone #: ###-####- per phone call with Bruce will reschedule