Final | 7/5/2019 | 7/5/2019 | 7/5/2019 | P | PASS |
Chad Schwendiman
|
|
|
garage code 0425 Phone #: ###-#### Inspection requested via web by Oleg Chervak
|
Final | 7/3/2019 | 7/3/2019 | 7/3/2019 | P | FAIL |
Brian Scoles
|
|
|
Garage code 0425 Phone #: ###-#### Inspection requested via web by Oleg Chervak- gas line penetration still needs sealed weather tight at meter location
|
Final | 7/2/2019 | 7/2/2019 | 7/2/2019 | P | FAIL |
Brian Scoles
|
|
|
GARAGE CODE 0425 Phone #: ###-#### Inspection requested via web by Oleg Chervak- need to seal gas line exterior penetration weather tight- need to seal/rodent proof lineset penetration where enters thru crawl vent
|
Rough-in | 5/6/2019 | 5/7/2019 | 5/7/2019 | P | PASS |
Jack Reynolds
|
|
|
corrections made. please re-inspect. Phone #: ###-#### Inspection requested via web by Oleg Chervak - 5lb flue pressure test - R/I ok
|
Rough-in | 5/2/2019 | 5/3/2019 | 5/3/2019 | A | FAIL |
Brian Scoles
|
|
|
CORRECTIONS MADE, PLEASE RE-INSPECT. THANK YOU. Phone #: ###-#### Inspection requested via web by Oleg Chervak- insulation shield needs to be around all b vent insulation can touch it- flue test failed gasuge at zero
|
Rough-in | 5/2/2019 | 5/2/2019 | 5/2/2019 | P | FAIL |
Brian Scoles
|
|
|
MEC AND FIREPL Phone #: ###-#### Inspection requested via web by Oleg Chervak- insulation shield in garage needs 1" clearance- need nail plate 2nd floor at floor on b vent- need to seal all supply and return ducting 2nd floor- flue test failed- talked with installer onsite about issues
|
Pressure Test | 5/2/2019 | 5/2/2019 | 5/2/2019 | P | FAIL |
Brian Scoles
|
|
|
MEC AND FIREPL Phone #: ###-#### Inspection requested via web by Oleg Chervak- 20lb gas pass tagged gas line meter location- flue test failed
|