Final | 6/21/2019 | 6/25/2019 | 6/25/2019 | A | PASS |
Chad Schwendiman
|
|
|
Phone #: ###-#### Inspection requested via web by Randy Hart
|
Rough-in | 5/14/2019 | 5/15/2019 | 5/15/2019 | A | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Randy Hart- R/I on fireplace and HVAC ok
|
Rough-in | 5/13/2019 | 5/14/2019 | 5/14/2019 | A | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Randy Hart- 24 inch wide platform still not installed from access to atticin stairwell to furnace platform- reinspection fee issued for multiple attempts
|
Rough-in | 5/10/2019 | 5/13/2019 | 5/13/2019 | A | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Randy Hart- correction not made- 24" wide accessable platform from stairwell access to furnace platform in attic still needs installed
|
Rough-in | 5/6/2019 | 5/10/2019 | 5/10/2019 | A | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Randy Hart- 1- outside air can not come into R/A register needs to be close to plenum 2- access platform to furnace needs completed from opening to furnace platform 3- R/A ducting in attic laying on b vent needs clearnces 4- dryer duct being smashed by nail plate needs to have wood notched more in 2 locations
left correction notice front window
|
Pressure Test | 5/6/2019 | 5/10/2019 | 5/10/2019 | A | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Randy Hart- 20lb gas pass tagged gas line
|