Final | 8/13/2020 | 8/14/2020 | 8/13/2020 | A | PART |
Chad Schwendiman
|
|
|
TEMP FINAL - IF QUESTIONS CALL STEVE @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann - Gas piping to dryers okay
|
Pressure Test | 6/25/2020 | 6/25/2020 | 6/25/2020 | P | PASS |
Chad Schwendiman
|
|
|
if questions call Steve @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann - 60 lb gas pass on main line from meter up to roof and 7th floor mech. room
|
Mec-Aging Inspection | 5/20/2020 | 5/20/2020 | 5/20/2020 | | CANC |
Chad Schwendiman
|
|
|
wip
|
Pressure Test | 2/19/2020 | 2/20/2020 | 2/20/2020 | A | PASS |
Troy James
|
|
|
if questions call Steve @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann 60# test from meter to branch lines at first level and riser to the 6th floor. Also inspected vent lines for the gas regulators.
|
Mec-Aging Inspection | 1/16/2020 | 1/16/2020 | 1/16/2020 | | CANC |
Chad Schwendiman
|
|
|
wip
|
Pressure Test | 10/17/2019 | 10/18/2019 | 10/18/2019 | A | PART |
Troy James
|
|
|
If there are any questions contact Steve at ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann Okay portion of gas piping main level for temporary gas heaters.
|
Pressure Test | 10/16/2019 | 10/17/2019 | 10/17/2019 | P | CANC |
Troy James
|
|
|
if questions call Steve @ ###-####. Phone #: ###-#### >> Inspection requested via web by Stacia Haumann Inspection cancelled from web by: Stacia Haumann
|