Final | 8/2/2019 | 8/5/2019 | 8/5/2019 | A | PASS |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Lynn Johnston - final ok
|
Final | 8/1/2019 | 8/1/2019 | 8/1/2019 | P | PART |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Lynn Johnston - need to see condensate line for high wall unit finished
|
Rough-in | 5/22/2019 | 5/23/2019 | 5/23/2019 | A | PASS |
Jack Reynolds
|
|
|
pressure test Inspection requested via web by Lynn Johnston - R/I ok - at final need to check high wall condensate drain being tie into plumbing in crawl
|
Pressure Test | 5/23/2019 | 5/23/2019 | 5/23/2019 | A | PASS |
Jack Reynolds
|
|
|
pressure test Inspection requested via web by Lynn Johnston - 20lb gas pressure test ok - tagged meter location
|
Rough-in | 5/21/2019 | 5/22/2019 | 5/22/2019 | P | FAIL |
Jack Reynolds
|
|
|
pressure test Inspection requested via web by Lynn Johnston - 20lb gas pressure test fail -gas line penetration needs to be wrapped with 10 mill tape - condensate line for high wall unit needs finished in the crawl
|
Pressure Test | 5/22/2019 | 5/22/2019 | 5/22/2019 | P | FAIL |
Jack Reynolds
|
|
|
pressure test Inspection requested via web by Lynn Johnston - gas pressure gauge needs to be a 30lb gauge set at 20lb
|