Final | 9/12/2019 | 9/13/2019 | 9/13/2019 | A | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Arcadio Martinez
|
Final | 9/5/2019 | 9/6/2019 | 9/5/2019 | A | CANC |
Eric Strole
|
|
|
Garage code is ASIN Phone #: ###-#### >> Inspection requested via web by Arcadio Martinez Inspection cancelled from web by: Arcadio Martinez
|
Rough-in | 6/24/2019 | 6/24/2019 | 6/24/2019 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Arcadio Martinez
|
Pressure Test | 6/19/2019 | 6/19/2019 | 6/19/2019 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Arcadio Martinez-20 lb gas test pass. 5 lb flue test pass.
|
Rough-in | 6/19/2019 | 6/19/2019 | 6/19/2019 | P | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Arcadio Martinez-Need to re submit manual-j.
|
Pressure Test | 6/17/2019 | 6/18/2019 | 6/18/2019 | P | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Arcadio Martinez-20 lb gas test fail.
|
Rough-in | 6/17/2019 | 6/18/2019 | 6/18/2019 | P | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Arcadio MartinezNo manual-j on site. Need insulation sheild on b-vent. Need to insulate ducts in garage overhead. Need to complete crawl.
|