Information based on query as of Sunday, May 12, 2024.
Permit Information
Permit NumberMEC19-02591
StatusFinaled
Name COX MECHANICAL INC
Site Address 6772 W TARGEE ST
Project Name 
Customer Number 
ePlanReviewNo
Description
New: packaged heat/cool units, unit heaters, evap coolers tailpipe exhaust system, exhaust fans and wall louvers, and air distribution
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final12/17/201912/17/201912/17/2019PPASS
DetailsBrian Scoles
Calvin and Russ are on site, moving duct in show room. number shown is Calvin''s. Robin Phone #: ###-#### Inspection requested via web by Robin Cox- final ok- card signed
Final12/5/201912/5/201912/5/2019PPART
DetailsBrian Scoles
Brian, would you call me to set a time that I can have Russ meet you.

Robin ###-#### Phone #: ###-#### Inspection requested via web by Robin Cox- need to seal 4 exterior penetrations GC will do- need CO detection system operational to verify working order- need flue extension for AC 4- will final out when these are completed- temp occupancy ok
Final12/3/201912/3/201912/3/2019PPART
DetailsBrian Scoles
Phone #: ###-#### Inspection requested via web by Robin Cox
1-need arma flex completed on mini split condenser
2- seal all exterior penetrations on mini split condenser and install 3/4" pvc 90 degree on drain
3- is all external duct insulated to R-12 need verification
4- need to seal all exterior penetrations on duct work thats not sealed
5- need installation instructions onsite for unit heaters
6- need air balance report onsite with CO detection system and need verification its operating properly
7- ac 4 need flue extension kit per approved drawings with in 10 feet of outside air of other unit
8- wasnt able to access all area do to floors being done-9 does ECs supply duct need insulated have call into engineer for verification-
Would like to meet on next inspection
Rough-in11/2/201911/4/201911/4/2019APASS
DetailsBrian Scoles
ceiling cover for grid ceiling Phone #: ###-#### Inspection requested via web by Robin Cox- R/I ok on ceiling grid all areas ok for ceiling tiles-
Rough-in10/30/201910/30/201910/30/2019PFAIL
DetailsBrian Scoles
Ceiling cover for grid ceiling installation Phone #: ###-#### Inspection requested via web by Robin Cox- rm 142 needs supply duct hooked up to register- rm 109 needs flex ducting supported off grid- rm116 need supply duct supported off grid- rm 130a need to verify that electrical closet is not getting an ceiling in it for transfer ducting wasnt shown on print to get enclosed around panel- Rest is good- still need to look at unit heaters and roof penetrations
Rough-in8/16/20198/16/20198/16/2019APART
DetailsBrian Scoles
exhaust fan in second floor restroom Phone #: ###-#### Inspection requested via web by Robin Cox- ef 2nd floor seal ok- ok to cover- rv work bay ef sealed internally ok- ok to cover
Rough-in7/31/20198/1/20198/1/2019PPART
DetailsBrian Scoles
duct seal RV parts offices Phone #: ###-#### Inspection requested via web by Robin Cox- duct seal on rv parts offices ok- ok to insulate
Rough-in7/17/20197/17/20197/17/2019PPASS
DetailsBrian Scoles
cover for sheetrock Phone #: ###-#### Inspection requested via web by Robin Cox- seal on exhaust ducts ok ok for sheetrock- hard lids ok to cover flex duct, insulation and seal ok all areas to cover- ok for grid in remaining rooms
Rough-in7/3/20197/3/20197/3/2019PPART
DetailsBrian Scoles
Duct seal inspection Phone #: ###-#### Inspection requested via web by Robin Cox- seal on supply and return ducting ok- ok to insulate- call in when exhaust fans and duct are all in