Final | 12/17/2019 | 12/17/2019 | 12/17/2019 | P | PASS |
Brian Scoles
|
|
|
Calvin and Russ are on site, moving duct in show room. number shown is Calvin''s. Robin Phone #: ###-#### Inspection requested via web by Robin Cox- final ok- card signed
|
Final | 12/5/2019 | 12/5/2019 | 12/5/2019 | P | PART |
Brian Scoles
|
|
|
Brian, would you call me to set a time that I can have Russ meet you.
Robin ###-#### Phone #: ###-#### Inspection requested via web by Robin Cox- need to seal 4 exterior penetrations GC will do- need CO detection system operational to verify working order- need flue extension for AC 4- will final out when these are completed- temp occupancy ok
|
Final | 12/3/2019 | 12/3/2019 | 12/3/2019 | P | PART |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Robin Cox 1-need arma flex completed on mini split condenser 2- seal all exterior penetrations on mini split condenser and install 3/4" pvc 90 degree on drain 3- is all external duct insulated to R-12 need verification 4- need to seal all exterior penetrations on duct work thats not sealed 5- need installation instructions onsite for unit heaters 6- need air balance report onsite with CO detection system and need verification its operating properly 7- ac 4 need flue extension kit per approved drawings with in 10 feet of outside air of other unit 8- wasnt able to access all area do to floors being done-9 does ECs supply duct need insulated have call into engineer for verification- Would like to meet on next inspection
|
Rough-in | 11/2/2019 | 11/4/2019 | 11/4/2019 | A | PASS |
Brian Scoles
|
|
|
ceiling cover for grid ceiling Phone #: ###-#### Inspection requested via web by Robin Cox- R/I ok on ceiling grid all areas ok for ceiling tiles-
|
Rough-in | 10/30/2019 | 10/30/2019 | 10/30/2019 | P | FAIL |
Brian Scoles
|
|
|
Ceiling cover for grid ceiling installation Phone #: ###-#### Inspection requested via web by Robin Cox- rm 142 needs supply duct hooked up to register- rm 109 needs flex ducting supported off grid- rm116 need supply duct supported off grid- rm 130a need to verify that electrical closet is not getting an ceiling in it for transfer ducting wasnt shown on print to get enclosed around panel- Rest is good- still need to look at unit heaters and roof penetrations
|
Rough-in | 8/16/2019 | 8/16/2019 | 8/16/2019 | A | PART |
Brian Scoles
|
|
|
exhaust fan in second floor restroom Phone #: ###-#### Inspection requested via web by Robin Cox- ef 2nd floor seal ok- ok to cover- rv work bay ef sealed internally ok- ok to cover
|
Rough-in | 7/31/2019 | 8/1/2019 | 8/1/2019 | P | PART |
Brian Scoles
|
|
|
duct seal RV parts offices Phone #: ###-#### Inspection requested via web by Robin Cox- duct seal on rv parts offices ok- ok to insulate
|
Rough-in | 7/17/2019 | 7/17/2019 | 7/17/2019 | P | PASS |
Brian Scoles
|
|
|
cover for sheetrock Phone #: ###-#### Inspection requested via web by Robin Cox- seal on exhaust ducts ok ok for sheetrock- hard lids ok to cover flex duct, insulation and seal ok all areas to cover- ok for grid in remaining rooms
|
Rough-in | 7/3/2019 | 7/3/2019 | 7/3/2019 | P | PART |
Brian Scoles
|
|
|
Duct seal inspection Phone #: ###-#### Inspection requested via web by Robin Cox- seal on supply and return ducting ok- ok to insulate- call in when exhaust fans and duct are all in
|