Final | 9/16/2019 | 9/16/2019 | 9/16/2019 | P | PASS |
Brian Scoles
|
|
|
ac 2018 Phone #: ###-#### Inspection requested via web by Gary Reeves- final ok
|
Final | 9/16/2019 | 9/16/2019 | 9/16/2019 | A | PART |
Brian Scoles
|
|
|
Jay- ###-####- duct blast test pass
|
Pressure Test | 7/3/2019 | 7/5/2019 | 7/5/2019 | A | PASS |
Chad Schwendiman
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves - 20lb gas
|
Rough-in | 7/3/2019 | 7/5/2019 | 7/5/2019 | A | PASS |
Chad Schwendiman
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves
|