Final | 10/4/2019 | 10/7/2019 | 10/7/2019 | A | PASS |
Brian Scoles
|
|
|
as early as possible . Inspection requested via web by Don Dowers- final ok
|
Final | 10/3/2019 | 10/4/2019 | 10/4/2019 | P | FAIL |
Brian Scoles
|
|
|
Inspection requested via web by Don Dowers- need air balance report onsite none could be found- need locking caps on refrigerant ports on A/C
|
Rough-in | 7/17/2019 | 7/18/2019 | 7/18/2019 | P | PASS |
Brian Scoles
|
|
|
Range goes through the wall. to the exterior. we do that on trim.key is in same spot as before. Inspection requested via web by Don Dowers- R/I ok- will need air balance and duct blast at final
|
Pressure Test | 7/18/2019 | 7/18/2019 | 7/18/2019 | P | PASS |
Brian Scoles
|
|
|
Range goes through the wall. to the exterior. we do that on trim.key is in same spot as before. Inspection requested via web by Don Dowers- 20lb gas pass tagged gas line at meter location- 5lb flue pass
|
Rough-in | 7/17/2019 | 7/17/2019 | 7/17/2019 | P | FAIL |
Brian Scoles
|
|
|
rough and gas pressure test. key in blue electrical box on side of house Inspection requested via web by Don Dowers- flue psi at 2/5 psi- need to support duct in crawl- 20lb gas pass tagged meter- range duct ?
|
Rough-in | 7/15/2019 | 7/16/2019 | 7/16/2019 | A | FAIL |
Brian Scoles
|
|
|
rough in and gas pressure test Inspection requested via web by Don Dowers- no access- house locked up- will need man j submitted to city for approval and have onsite for inspection
|