Conference | 9/12/2019 | 9/13/2019 | 9/13/2019 | A | CANC |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Rigsby - should have been a final
|
Final | 9/13/2019 | 9/13/2019 | 9/13/2019 | A | PASS |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Rigsby - final ok
|
Conference | 7/22/2019 | 7/22/2019 | 7/22/2019 | P | CANC |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Rigsby- should have been R/I inspection
|
Rough-in | 7/22/2019 | 7/22/2019 | 7/22/2019 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Rigsby- minisplit R/I ok
|
Conference | 7/19/2019 | 7/22/2019 | 7/22/2019 | A | NR |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Rigsby- need to add 2 bath exhaust and 1 dryer to permit and pay fee- condensate drain for minisplit needs ran in 3/4" pvc in wall- recall in inspection when ready- do not cover
|