Mec-Aging Inspection | 7/9/2020 | 7/9/2020 | 7/9/2020 | | FAIL |
Brian Scoles
|
|
|
contractor needs to schedule final inspection if works complete or request extension- need to see regulators installed on 2# system- permit will expire next aging if no activity
|
Mec-Aging Inspection | 4/9/2020 | 4/9/2020 | 4/9/2020 | | CANC |
Brian Scoles
|
|
|
|
Rough-in | 1/9/2020 | 1/10/2020 | 1/10/2020 | A | PASS |
Brian Scoles
|
|
|
Please call John with questions ###-####. Thank you. Phone #: ###-#### Inspection requested via web by Jennifer Alcala- 60lb gas pass future underground to future pool and under house to meter location- tagged gas line where gauge is on north side of house
|
Pressure Test | 8/12/2019 | 8/12/2019 | 8/12/2019 | A | PASS |
Brian Scoles
|
|
|
20lb gas pass for future pool equipment and shop- electrical permit has been issued and inspected- ok to back fill- will need pvc sleeve around riser if concrete will be poured around riser
|
Pressure Test | 8/6/2019 | 8/7/2019 | 8/7/2019 | A | PART |
Brian Scoles
|
|
|
Please call Brian when on the way ###-####. Thank you. Phone #: ###-#### Inspection requested via web by Jennifer Alcala- 20lb gas pass underground from house to back of property- this permit will pass once electrical permit has been issued and inspected- DO NOT COVER- this gas line is for future pool equipment pool not being installed at this time- call in final when ready
|
Pressure Test | 8/5/2019 | 8/6/2019 | 8/6/2019 | P | CANC |
Brian Scoles
|
|
|
Please call Brian ###-#### when on the way. Thank you, Phone #: ###-#### >> Inspection requested via web by Jennifer Alcala Inspection cancelled from web by: Jennifer Alcala
|