Final | 12/9/2019 | 12/9/2019 | 12/9/2019 | P | PASS |
Jack Reynolds
|
|
|
Reinspect Phone #: ###-#### Inspection requested via web by Randy Hart - final ok
|
Final | 12/5/2019 | 12/6/2019 | 12/5/2019 | P | CANC |
Jack Reynolds
|
|
|
Phone #: ###-#### >> Inspection requested via web by Randy Hart Inspection cancelled from web by: Randy Hart
|
Final | 12/4/2019 | 12/5/2019 | 12/5/2019 | A | FAIL |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Randy Hart - need to see combustion opening in doors at laundry room and mech closet for final - locking caps at A/C - line set UV protection and line set penetration sealed
|
Rough-in | 10/16/2019 | 10/16/2019 | 10/16/2019 | P | PASS |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Randy Hart - R/I ok - lower combustion air in laundry room door will be seen at final
|
Rough-in | 10/15/2019 | 10/16/2019 | 10/16/2019 | A | CANC |
Jack Reynolds
|
|
|
Phone #: ###-#### >> Inspection requested via web by Randy Hart Inspection cancelled from web by: Randy Hart
|
Rough-in | 10/11/2019 | 10/15/2019 | 10/15/2019 | A | FAIL |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Randy Hart - need city approved man j onsite - fresh air needs ran to furnace return plenum - line set insulation at floor penentrations needs fixed - combustion air for furnace needs to be per IECC R402.4.4 or combustion air needs taken through high/low grilles inside place
|
Pressure Test | 10/11/2019 | 10/15/2019 | 10/15/2019 | A | PASS |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Randy Hart - 20lb gas pressure test ok - tagged meter location
|