Final | 9/27/2019 | 10/1/2019 | 10/1/2019 | P | PASS |
Brian Scoles
|
|
|
Contact Robert (QHC) @ ###-#### or QHC Office @ Phone #: ###-#### Inspection requested via web by Kevin Pratley- 2 tube heater and gas piping final ok
|
Final | 9/25/2019 | 9/27/2019 | 9/27/2019 | P | CANC |
Brian Scoles
|
|
|
Mid to late afternoon final requested. please contact Rober (QHC) @ ###-#### or Kevin (QHC) @ Phone #: ###-#### Inspection requested via web by Kevin Pratley- per phone call with Robert not ready will reschedule
|
Pressure Test | 9/24/2019 | 9/25/2019 | 9/25/2019 | A | PASS |
Brian Scoles
|
|
|
Contact Robert (QHC) @ ###-#### or Kevin (QHC) @ Phone #: ###-#### Inspection requested via web by Kevin Pratley- 60lb gas pass- tagged meter location
|