Final | 4/21/2020 | 4/21/2020 | 4/21/2020 | P | PASS |
Ben Livingston
|
|
|
it''s all finished with ac having port new keyed caps Phone #: ###-#### Inspection requested via web by Manuel Canto
|
Final | 4/8/2020 | 4/9/2020 | 4/10/2020 | A | PART |
Ben Livingston
|
|
|
call jamon from strite to make sure he is at jobsite to get access to inspector Thanks Phone #: ###-#### Inspection requested via web by Manuel Canto - condencer needs locking caps, send me a picture for final Manny - inspection done by video
|
Rough-in | 2/24/2020 | 2/24/2020 | 2/24/2020 | P | PASS |
Ben Livingston
|
|
|
Job will be ready for inspection around 2pm Thanks Phone #: ###-#### Inspection requested via web by Manuel Canto - 20lb, rough in -
|
Rough-in | 2/20/2020 | 2/20/2020 | 2/20/2020 | P | CANC |
Ben Livingston
|
|
|
JOB SHOULD BE READY FOR INSPECTION AROUND 2 PM THANKS Phone #: ###-#### Inspection requested via web by Manuel Canto - consultation -
|
Pressure Test | 1/12/2020 | 1/13/2020 | 1/13/2020 | A | PASS |
Ben Livingston
|
|
|
JOB WILL BE READY FOR INSPECTION AROUND 11-NOON THANKS Phone #: ###-#### Inspection requested via web by Manuel Canto - 60lb to reg., 20lb after reg - - all future piping has been capped off and will be tested at a later date -
|