MIS-Aging Inspection | 8/21/2019 | 8/21/2019 | 8/21/2019 | | DONE |
Brandon Shaw
|
|
|
|
DOC - Permit Finaled | 8/21/2019 | 8/21/2019 | 8/21/2019 | P | PASS |
Brandon Shaw
|
|
|
|
MIS-Aging Inspection | 5/22/2019 | 5/22/2019 | 5/22/2019 | | PEND |
Jim Storey
|
|
|
Telephone call 8/22/2018 DONE
Jim Storey called Katelyn to see what to do next-we need to keep checking-Katelyn will start a code enforcement case
|
MIS-Aging Inspection | 2/20/2019 | 2/20/2019 | 2/21/2019 | | CANC |
Brandon Shaw
|
|
|
|
MIS-Aging Inspection | 11/21/2018 | 11/21/2018 | 11/21/2018 | | PASS |
Jim Storey
|
|
|
zonning issue. Routing Walk-In (Zoning) 9/19/2017 9/19/2017 9/19/2017 P FAIL DetailsKatelyn Menuge Structure not permitted in rear setback. Application received 9/19/2017
|
MIS-Aging Inspection | 8/22/2018 | 8/22/2018 | 8/22/2018 | | FAIL |
Jim Storey
|
|
|
Routing Walk-In (Zoning) 9/19/2017 9/19/2017 9/19/2017 P FAIL DetailsKatelyn Menuge Structure not permitted in rear setback. Application received 9/19/2017
|
MIS-Aging Inspection | 5/23/2018 | 5/23/2018 | 5/25/2018 | | PASS |
Jim Storey
|
|
|
Non additional work has been done since Stop Work Order was posted... see previous enrty
|
MIS-Aging Inspection | 2/21/2018 | 2/21/2018 | 2/26/2018 | | DONE |
Brandon Shaw
|
|
|
Non additional work has been done since Stop Work Order was posted... see previous enrty
|
MIS-Aging Inspection | 11/22/2017 | 11/22/2017 | 11/24/2017 | | PEND |
Brandon Shaw
|
|
|
Stop Work Order issued 8/23/17
|
Set Bond Amount | 8/23/2017 | 9/6/2017 | 9/12/2017 | A | PASS |
Brandon Shaw
|
|
|
|
BLD-Conference | 8/23/2017 | 8/23/2017 | 8/23/2017 | A | PEND |
Brandon Shaw
|
|
|
Work without permit- New roof, and sheathing at gable ends, added ridge line to new addition to South East corner. Footing/foundation appears to be CMU. Framing mostly done, cut out for door and window, with insulation. Stop Work Order served, revisit in two weeks.
|