BLD-Conference | 4/13/2018 | 4/20/2018 | 4/20/2018 | A | PASS |
Jim Sly
|
|
|
Check... Obtained permit.
|
DOC - Permit Finaled | 4/20/2018 | 4/20/2018 | 4/20/2018 | P | PASS |
Jim Sly
|
|
|
|
ELE-Conference | 4/16/2018 | 4/18/2018 | 4/17/2018 | A | PASS |
Tom Saunders
|
|
|
check for permit...owner informed me Centerline Electric will be taking over work and pulling a permit...called Jaime with Centerline and he agreed that yes he is pulling a permit once he starts the work
|
ELE-Conference | 4/9/2018 | 4/16/2018 | 4/16/2018 | A | PASS |
Tom Saunders
|
|
|
check for permit being pulled...homeowner notified Centerline Electric is pulling permit...scheduled inspection for 4/18/18 to verify
|
BLD-Conference | 4/10/2018 | 4/13/2018 | 4/13/2018 | P | CANC |
Jim Sly
|
|
|
|
BLD-Conference | 4/6/2018 | 4/9/2018 | 4/10/2018 | A | DONE |
Jim Sly
|
|
|
work w/o permits-ele, plm and bld Shane to get permit
|
PLM-Conference | 4/6/2018 | 4/9/2018 | 4/9/2018 | A | PASS |
Dan Ediger
|
|
|
work w/o permits-ele, plm & bld. New builder. Spoke with him and explained the permit process. A plumber did the work and will pull a permit.
|
ELE-Conference | 4/6/2018 | 4/9/2018 | 4/9/2018 | A | PASS |
Tom Saunders
|
|
|
work w/o permits-ele, plm & bld...discussed with home owner the need for electrical permit...stated is flipping and electrical is being done by brother...informed Tarah that she can not pull a homeowners electrical permit for the fact that she is going to sell the house...she stated her brother is a licensed electrical contractor...gave her 5 days to get proper permits pulled or will place a stop work order on house...future inspection is scheduled for 4/16/18
|