MEC-Conference | 12/18/2019 | 12/19/2019 | 12/19/2019 | A | DONE |
Chad Schwendiman
|
|
|
Rick Martinez ###-#### - No evidence of new mechanical work being done at this time. I informed the genral contractor that if any new mechanical work is required a mechanical permit while be needed.
|
PLM-Conference | 12/18/2019 | 12/19/2019 | 12/19/2019 | A | PASS |
Daryl Spivey
|
|
|
Rick Martinez ###-#### walk thru on 3rd and 5th floor bathroom remdel.........new fixtures being installed requires a plg permit...........Paige Mech doing work.........ds
|
ELE-Conference | 12/17/2019 | 12/17/2019 | 12/17/2019 | P | DONE |
Daryl DeGrange
|
|
|
Electrical work being performed a long with other trades that require permits. Stop work order until all required permits have been obtained.
|
BLD-Conference | 12/10/2019 | 12/10/2019 | 12/11/2019 | A | PEND |
Dave Hannah
|
|
|
touch base w/ jim page// access is jason w/ arch. idaho power. I talked with him friday. jstorey talked with jason and walked floors he will get ahold of trade inspector to see what they need for permits and call carel m for bld permits
|
BLD-Conference | 12/6/2019 | 12/9/2019 | 12/11/2019 | A | DONE |
Dave Hannah
|
|
|
touch base w/ jim page// access is jason w/ arch. idaho power. I talked with him friday. jstorey
|
BLD-Conference | 12/6/2019 | 12/6/2019 | 12/6/2019 | P | DEFR |
Jim Storey
|
|
|
to dave
|